Update maven Docker tag to v3.9.8 #8

Closed
renovate-bot wants to merge 1 commits from renovate/maven-3.x into master
Contributor

This PR contains the following updates:

Package Type Update Change
maven stage patch 3.9.6-eclipse-temurin-17-alpine -> 3.9.8-eclipse-temurin-17-alpine

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | maven | stage | patch | `3.9.6-eclipse-temurin-17-alpine` -> `3.9.8-eclipse-temurin-17-alpine` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4zNjguMyIsInVwZGF0ZWRJblZlciI6IjM3LjQyMC4xIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbXX0=-->
renovate-bot changed title from Update maven Docker tag to v3.9.7 to Update maven Docker tag to v3.9.8 2024-06-27 18:01:07 +00:00
renovate-bot force-pushed renovate/maven-3.x from c5e8d83f23 to ea407865a4 2024-06-27 18:01:08 +00:00 Compare
Fascinated closed this pull request 2024-07-30 20:51:02 +00:00

Pull request closed

Sign in to join this conversation.
No reviewers
No Label
No Milestone
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: Fascinated/ScoreSaberUtils-Backend#8
No description provided.